We personalize our customers' journeys with our energy and engineering solutions; We produce efficient, safe and sustainable projects.

Follow Us
Follow Us

University-Approved Solar Plant Design

University Approved Solar Project

University Approved Technical Reporting

In the SPP acceptance processes of TEDAŞ and other official institutions, it is required that the technical competence of the project be registered by an academic authority. GMR Energyenables your project to become official with approved reports received from Türkiye's distinguished universities in all engineering disciplines, from static calculations to ground survey.

Our Service Scope

We strengthen the legal basis of your investment and manage all academic approval processes on your behalf:

  • Static Project Approval: Examination and approval of roof and Ground-Mounted Solar Power Plant construction projects by the relevant Civil Engineering departments.
  • Soil Survey Approval: Academic confirmation of the geological studies carried out in the field and the reports prepared by the Geology / Geophysics departments.
  • Tensile Test Report: University approval of the test results proving the carrying capacity of driven piles in land solar power projects.
  • Technical Opinion (Opinion): Preparation of expert academic technical opinion reports requested for special cases or complex projects.

Advantages of the Process

01.
official
acceptance

It makes the technical adequacy of your project indisputable in the eyes of TEDAŞ, EPDK and banks.

02.
legal
Assurance

University reports are strong evidence in case of possible technical disputes.

03.
Prestige &
Quality

It documents that your investment has been designed and audited to academic standards.

Frequently Asked Questions (FAQ)

Yes, universities request an official fee for this service through revolving fund enterprises.

Yes, we manage the entire process, from preparing the files to submitting them to the university and receiving the approved report.

Projects are approved as long as they technically comply with the standards. In case of nonconformity, it is revised and submitted again.

Engineering Tomorrow's Energy Today.

GMR Solar - Image of sustainable energy investment with solar panels