Preliminary Solar Plant Structural Design

Preliminary Solar Plant Structural Design

SPP Preliminary Static Project and Feasibility

The most critical stage of Solar Power Plant (SPP) investments is to verify the feasibility of the project with technical data. GMR Energy analyzes land and roof suitability from a statical perspective so that investors can make informed decisions, Preliminary Static Project We eliminate surprise costs and risks with our service.

Scope of Analysis

We make a detailed preliminary assessment according to the geographical conditions of the region and the existing building characteristics:

Load Analysis

Calculation of snow, wind and earthquake loads in the installation area according to TS 498 and Eurocode standards.

Carrying Capacity

Checking the resistance of existing roof trusses or land against additional loads (panel + construction).

Section Determination

Determining the approximate dimensions and weights (tonnage) of the steel or aluminum profiles to be used.

Strengthening Suggestions

Reporting the necessary strengthening methods for structural elements deemed inadequate.

Benefits to Investors

01.
Budget
Accuracy

It clarifies the total budget of the project by predicting steel costs in advance.

02.
Risk
Management

It secures the investment by eliminating statically unsuitable areas.

03.
fast
Process

It detects possible obstacles and prevents loss of time before proceeding with the official project approval process.

Frequently Asked Questions (FAQ)

It is recommended to do this while creating the investment budget or just before making the decision to purchase land/building.

Not every roof may be suitable. With the preliminary static examination, the current load capacity of the roof and the need for reinforcement are determined.

Although it varies depending on the size of the project, preliminary static analysis reports are generally delivered within 3-5 business days.

Engineering Tomorrow's Energy Today.