Preliminary Solar Plant Structural Design
SPP Preliminary Static Project and Feasibility
The most critical stage of Solar Power Plant (SPP) investments is to verify the feasibility of the project with technical data. GMR Energy analyzes land and roof suitability from a statical perspective so that investors can make informed decisions, Preliminary Static Project We eliminate surprise costs and risks with our service.
Scope of Analysis
We make a detailed preliminary assessment according to the geographical conditions of the region and the existing building characteristics:
Load Analysis
Calculation of snow, wind and earthquake loads in the installation area according to TS 498 and Eurocode standards.
Carrying Capacity
Checking the resistance of existing roof trusses or land against additional loads (panel + construction).
Section Determination
Determining the approximate dimensions and weights (tonnage) of the steel or aluminum profiles to be used.
Strengthening Suggestions
Reporting the necessary strengthening methods for structural elements deemed inadequate.
Benefits to Investors
Budget
Accuracy
It clarifies the total budget of the project by predicting steel costs in advance.
Risk
Management
It secures the investment by eliminating statically unsuitable areas.
fast
Process
It detects possible obstacles and prevents loss of time before proceeding with the official project approval process.
Frequently Asked Questions (FAQ)
It is recommended to do this while creating the investment budget or just before making the decision to purchase land/building.
Not every roof may be suitable. With the preliminary static examination, the current load capacity of the roof and the need for reinforcement are determined.
Although it varies depending on the size of the project, preliminary static analysis reports are generally delivered within 3-5 business days.