The projects requested for Solar Power Plants (SPP) are prepared in accordance with the conditions specified in the call letter and the applicable regulations. This process includes the development and approval of projects to be submitted to the General Directorate of TEDAŞ or the Electricity Distribution Company (EDAŞ) in the relevant distribution region.
Our Comprehensive Project Services
The necessary technical drawings, short circuit calculations and power flow analyzes for electrical system components are made by our expert engineers. Our projects are designed to ensure that the investment is long-lasting and efficient.
Project Steps
01.
LV/MV Single Line Diagrams
Electrical design of the power plant's grid connection and internal distribution system.
02.
Layout and String Plans
Panel layouts, inverter placement and DC cabling optimization.
03.
Grounding Projects
Protection grounding and lightning protection calculations for system security.
04.
Energy Transmission Lines (ENH)
Project design of the transmission line from the power plant to the substation.
Frequently Asked Questions (FAQ)
If the documents are complete, the approval process at TEDAŞ or EDAŞ generally takes between 2 and 4 weeks.
The project file must be submitted to the relevant institution within 90 days from the notification date of the call letter.
Detailed engineering files such as single line diagrams, layout plans, short circuit calculations, grounding projects, static projects and power plant layout plans are prepared.