Project Overview
- Company: Çalışkanlar SPP
- Capacity: 219 kWp
- Location: Erzurum, Türkiye
- Plant Type: Ground-Mounted PV
- Annual Energy Production: 328,500 kWh/year
- Carbon Emission Reduction: 151.11 tons of CO₂/year
- Planted Tree Equivalent: 7,253.28
- Household with Electricity: 121,7
Project Details
In the Çalışkanlar SPP project, by commissioning 219 kWp installed power with Ground-Mounted PV infrastructure in Erzurum, Türkiye, we ensure the technical reliability of the investment and long-term energy continuity at the same time.
With this investment, we produce 328,500 kWh/year of electricity, increase operational efficiency while balancing the energy costs of the business, and make a measurable contribution to sustainable growth targets.
The system strengthens the brand's green transformation performance with concrete data by creating an annual carbon emission reduction of 151.11 tons of CO₂/year and an environmental benefit equivalent to 7,253.28 trees.
While the energy produced corresponds to the annual consumption of approximately 121.7 households, the commissioning, operation and long-term performance process of the project is supported by a strong operation model with GMR Energy's end-to-end approach.