Project Overview
- Company: Çakıroğlu SPP
- Capacity: 1,699 kWp
- Location: Erzurum, Türkiye
- Plant Type: Ground-Mounted PV
- Annual Energy Production: 2,548,500 kWh/year
- Carbon Emission Reduction: 1,172.31 tons of CO₂/year
- Planted Tree Equivalent: 56,270.88
- Household with Electricity: 943,9
Project Details
In the Çakıroğlu SPP project, by commissioning 1,699 kWp installed power with Ground-Mounted PV infrastructure in Erzurum, Turkey, we ensure the technical reliability of the investment and long-term energy continuity at the same time.
With this investment, we produce 2,548,500 kWh/year of electricity, increase operational efficiency while balancing the energy costs of the business, and make a measurable contribution to sustainable growth targets.
The system strengthens the brand's green transformation performance with concrete data by creating an annual carbon emission reduction of 1,172.31 tons of CO₂/year and an environmental benefit equivalent to 56,270.88 trees.
While the energy produced corresponds to the annual consumption of approximately 943.9 households, the commissioning, operation and long-term performance process of the project is supported by a strong operation model with GMR Energy's end-to-end approach.