Project Overview
- Company: Bahamas Elehtura Family Islands Hybrid Power Plants
- Capacity: 10,411 kWp
- Location: Elehtura, Bahamas
- Plant Type: Ground-Mounted PV
- Annual Energy Production: 15,616,500 kWh/year
- Carbon Emission Reduction: Information will be added
- Planted Tree Equivalent: 344,812.32
- Household with Electricity: 5,783,9
Project Details
In the Bahamas Elehtura Family Islands Hybrid Power Plants project, by commissioning 10,411 kWp installed power with Ground-Mounted PV infrastructure in Elehtura, Bahama, we ensure the technical reliability of the investment and long-term energy continuity at the same time.
With this investment, we produce 15,616,500 kWh/year of electricity, increase operational efficiency while balancing the energy costs of the business, and make a measurable contribution to sustainable growth targets.
The project creates an environmental contribution equivalent to 344,812.32 trees; Metrics related to carbon emission impact will be included in updated reporting as field measurements are completed.
While the energy produced corresponds to the annual consumption of approximately 5,783.9 households, the commissioning, operation and long-term performance process of the project is supported by a strong operation model with GMR Energy's end-to-end approach.