Project Overview
Technical data and environmental gains obtained within the scope of the project:
- Company: Ada Tersanesi SPP - 1.320 kWp Aksaray
- Capacity: 1,320 kWp
- Location: Aksaray, Türkiye
- Plant Type: Ground-Mounted Solar Power Plant
- Annual Energy Production: 1,980,000 kWh/year
- Carbon Emission Reduction: 911 tonnes CO₂/year
- Planted Tree Equivalent: 43,728 trees/year
- Household with Electricity: 733 digits
Project Details
Ada Tersanesi SPP - 1.320 kWp Aksaray project is a project implemented with the vision of a pioneering and sustainable future in clean energy production.
This project, for which we, as GMR Energy, undertook the engineering and project planning processes, meets the energy needs of the region and contributes to Türkiye's energy independence and green transformation. Optimized through meticulous engineering studies, the power plant operates with high efficiency.
Project Gallery
Scenes from our Ada Tersanesi SPP - 1.320 kWp Aksaray project: